Preview

Issues of Risk Analysis

Advanced search
Open Access Open Access  Restricted Access Subscription or Fee Access

Risk Analysis in Financial Models of Innovative Projects

EDN: SXSQMO

Abstract

A feature of innovative projects is a significant amount of uncertainty at the stage of formation and development and a set of risk factors characteristic of the project being implemented. These uncertainties and risks determine the possible deviation of the project results from the planned indicators. By their nature, risks and uncertainties are related to random variables, each of which is characterized by its own distribution and parameters. Taking into account these characteristics of input variables makes it possible, using mathematical methods for processing random variables, to determine output results in financial models of industrial projects that take into account the main risk and uncertainty factors. This study presents the results of using well-known mathematical methods and characteristics of random input variables in financial planning systems.

The peculiarity of such planning is taken into account by the "Project-Risk" program specially developed this purpose. To determine the distributions of random variables, the program uses the “ModelRisk” for add-in, which allows it to obtain the necessary characteristics of the input random variables. The "Solution Search" add-in is used to solve the optimization problems of the planned parameters.

As one of the possible options for optimizing the project, an algorithm for product planning is considered with the determination of the profit/risk ratio, which allows, by varying the initial data, to achieve the required values of its output characteristics. The results of the planned project can be presented on the "time–profit" plane, taking into account the probability of reaching certain areas of this diagram.

About the Authors

V. L. Gorbunov
Institute of System and Software Engineering and Information Technology, National Research University «MIET»
Russian Federation

Vladimir L. Gorbunov

Shokin Square, 1, Zelenograd, Moscow, 124498



I. V. Zhdanova
Institute of System and Software Engineering and Information Technology, National Research University «MIET»
Russian Federation

Irina V. Zhdanova

Shokin Square, 1, Zelenograd, Moscow, 124498



References

1. Kapustina N.V. Theoretical and methodological approaches of risk management: monograph. M.: INFRA-M, 2020. 140 p. (In Russ.)

2. Hill, Terry, and Roy Westbrook. “SWOT analysis: It’s time for a product recall”. Long Range Planning, vol. 30, no. 1, Feb. 1997, P. 46–52. https://doi.org/10.1016/s0024-6301(96)00095-7

3. Stamatis D.H. Failure mode and effect analysis: FMEA from theory to execution. ASQC Quality Press. 2003. 488 p.

4. Moder J.J., Phillips C.R., & Davis E.W. Project management with CPM, PERT, and precedence diagramming; Van Nostrand Reinhold. 1983. 389 p.

5. Linstone, H. A., & Turoff, M. The Delphi Method: Techniques and Applications. Addison-Wesley. 1975. 621 p.

6. Saltelli, A., Chan, K., & Scott, E. M. Sensitivity Analysis. Wiley. 2000. 504 p.

7. Dinis, M.L., Fiúza, A. (2011). Using Monte-Carlo Simulation for Risk Assessment: Application to Occupational Exposure during Remediation Works. In: Dimov, I., Dimova, S., Kolkovska, N. (eds) Numerical Methods and Applications. NMA 2010. Lecture Notes in Computer Science, vol 6046. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-18466-6_6

8. Zueva T.I. Analysis of modern risk management standards for project-oriented enterprises // Znanie. 2020;(1-1):43–48. (In Russ.)

9. Certificate of state registration of the computer program No. 2022612229 Russian Federation. Project-Risk: No. 2021680848: Application 14.12.2021: publ. 09.02.2022 / V.L. Gorbunov. (In Russ.) — EDN MBRMHS

10. Gorbunov V.L. Business planning with risk assessment and project efficiency, Moscow: RIOR Infra-M. 2019. 248 p. (In Russ.)

11. Zharov D. Financial modeling in Excel. M.: Alpina Publisher. 2023. 248 p. (In Russ.)

12. Abrams R. A 100% business plan. Strategy and tactics of effective business. M: Alpina Publisher. 2019. 486 р. (In Russ.)

13. Roy L. Nersesian Energy Risk Modeling. Palisade Corporation. NY USA 2013. 533 р.

14. Kostyukova A.I. C heremisina S.G. Business risks: the essence and possibilities of management // Innovation Science. 2017;(5):103–105. (In Russ.)

15. Petrov A.M., Tsypin A.P., Kuzin M.A. New financial analysis tools in company management // Economic Sciences. 2021;(12):466-473. (In Russ.). https://doi.org/10.14451/1.205.466

16. Bykova R.G. Specifics of risk management in design activity // Herald of Omsk University. Series: Economics. 2013;(4):113–118. (In Russ.)


Review

For citations:


Gorbunov V.L., Zhdanova I.V. Risk Analysis in Financial Models of Innovative Projects. Issues of Risk Analysis. 2025;22(5):74-83. (In Russ.) EDN: SXSQMO

Views: 20


ISSN 1812-5220 (Print)
ISSN 2658-7882 (Online)